Waste pipe dug & assembled for toilet waste to connect to mains.

Ashtons Handyman ServicesAshtons Handyman ServicesAshtons Handyman ServicesAshtons Handyman ServicesAshtons Handyman ServicesAshtons Handyman Services

Categories
Uncategorized

Entrance made through from Kitchen to garage

The customer wants an entrance made through wall into garage. The door, which is supplied measures 760mm wide. So need to cut width to include door frame. Also the floor in the garage is a different level to the floor in the kitchen so this has to be taken into account when cutting the height to include lintel as well.

davdavdavdavdavdavdav

Categories
Uncategorized

Double door entrance to sitting room turned into on door entrance.


Finished off with a plaster skim, once dry will blend in making a one door entrance. Just needs painting now. Nice.

Categories
Uncategorized

Internal door replaced with new.

The new door had to be cut down to fit. With panelled door one should replace the wooden batten back with glue.
 Once fitted, the latch and door handles are fitted. Job done. 

Categories
Uncategorized

Covered damp chimney breast

This chimney breast had damp coming through the plaster and the customer wanted it covering over with new. So I suggested dry walling over and plastering.

dav

I used 3×2 stud wall timber to the breast area keeping the timber spaced away from the surface with plastic so that the wood would not absorb the moisture.

dav
I also made a cut for ventilation.

Next I added the plaster board.

dav
Corner trim is added

Next part of the job is to plaster.

IMG_20160527_150730

Then finish of with skirting and cover over the air vent.

dav
Nice job

 

Categories
Ashtons Handyman Servies Decorating Uncategorized

A small plastering & patch up job

There was a small hole in the plaster board where the old heating pipes had been capped off. So cutting a square I fitted a new piece. Then a quick skim over with plaster. Much better.

Categories
Ashtons Handyman Servies Bathroom fitting Uncategorized

Bathroom in Wynyard redesigned.

The customer wanted to remove the large boxed in area under the window in order to make more space. I suggested moving the toilet & wash basin around so the waste from the toilet was closer to the down pipe. The supply to the basin was chased in which allowed the positioning to be directly under the window.

Before

IMAG0621

IMAG0623

Removed the utilities & opened up the boxing in, to view the waste & supply.

IMAG0624IMAG0625

I have already removed the toilet was, but you can see the down pipe. Once I was happy with the pipe work re design I boxed in as tight as possible and started tiling.

IMAG0627

IMAG0636IMAG0637

bur

The customer wanted lino tiles place for the flooring so, I added some 5 mm ply as a clean surface to work on. Once I had placed the flooring tiles I continued with fitting the toilet & wash basin to the new positions.

pro-cam

pro-cam

pro-cam

Looking great!

Hi Chris.  All looks great. The floor tiles just make a particular bold feature and the work you did on the sloped box just adds to the space. Happy customer.

Categories
Ashtons Handyman Servies Uncategorized

Stair Banister fitted

Fitted this timber to the existing banister as the gap was too wide and dangerous for small children.

Stair Banister

With a coat of paint and a bit of filling this will look smart.

Categories
Ashtons Handyman Servies Uncategorized

New fence constructed.

I suggested we build a boarded fence at 6 foot high as a paneled fence was not wide enough. This now gives more privacy from a the neighbour.

image

image

image

image

Gave the decking a scrubbing down and re weathered proofed with a vanish. Looking good.

Categories
Ashtons Handyman Servies Uncategorized

Skirting Fitted

Completed the job fitting 32 metres of 7 inch skirting to this property in Thornaby. The detail under the bay window was fitted by cutting the board into segments to make the bend, then the gaps were filled with plaster to smooth off.

Skirting_0219Skirting_0220

Categories
Ashtons Handyman Servies Uncategorized

Hole in shower, fixed.

Having replaced the plaster board and made sure it was stuck & firm I was able to replace the old tiles & grout. Water tight.

Categories
Uncategorized

New laminate flooring laid after replacing floor board.

Removed toilet and washbasin to fit laminate under and fitted back with isolation values. Nice. #onsuite
image

Also added a new skirting.

Categories
Uncategorized

Boxed in boiler.

Completed this job using a cabinet supplied by Howdens. The cabinet had to be cut down to size in depth and allow for pipe work, but you wouldn’t notice. Extra storage space as well.

image

Contact Chris if you would like one fitted.

Categories
Uncategorized

Flat Pack daybed assembed

From taking out of the packaging to completed assemble in 2 and a half hours.

flat pack assembly

Categories
Uncategorized

Flat packs assembled. 8 units to assemble, and completed in a day and half.

image

image

Categories
Uncategorized

Ceiling plastered.

The holes are for the spot lights.

ceiling plstering

Categories
Uncategorized

Internal partition wall constructed and plastered.

DSC_0060 IMG_0028