The customer wanted to remove the large boxed in area under the window in order to make more space. I suggested moving the toilet & wash basin around so the waste from the toilet was closer to the down pipe. The supply to the basin was chased in which allowed the positioning to be directly under the window.
Before
Removed the utilities & opened up the boxing in, to view the waste & supply.
I have already removed the toilet was, but you can see the down pipe. Once I was happy with the pipe work re design I boxed in as tight as possible and started tiling.
The customer wanted lino tiles place for the flooring so, I added some 5 mm ply as a clean surface to work on. Once I had placed the flooring tiles I continued with fitting the toilet & wash basin to the new positions.
Looking great!
Hi Chris. All looks great. The floor tiles just make a particular bold feature and the work you did on the sloped box just adds to the space. Happy customer.