Photographs of Work Done

Ashtons Handyman Services

Ashtons Handyman Services


Ashtons Handyman Services

Ashtons Handyman Services

Handyman Services

Handyman Services

dsc_0172.jpgwpid-wp-1447432445749.jpegWallpaperingGate made to measurewpid-wp-1444762739205.jpeg

Wall cabinets

Wall Cabinets and work top.

2015-06-04 14.53.36

Finished assembly, under 4 hours.

The Old Rectory After_1


Area dug out for concrete base


Fence post foundation


Concrete base and side wall


Shoe box made


Flat pack sliding door wardrobe assembly


Hot & cold mixer tape assembled in stud walling




On suite bathroom building on site


Front of shop painted in Stockton on Tees



Sharp sand used to get level for paving


Job done

Building decking

Decking assembled

Decking made from supplied kit


Seated shoe box

fence construction

Replace new fencing with stronger fixings. Added new 4×4 post into concert. This will not blow down.

Fencing job commission

Building of fence.

rased bedding


Decking and rased bed

Decking and rased bed build


Decking and rased bed build

Boarding fire place

Boarding up fire place


Wall boarding & plasted

Kitchen Tiling

Kitchen Tiling

Kitchen sink replacing before & after

Kitchen sink replacing before & after

Laminate Flooring

Laminate Flooring

High spec detailed decorating work

High spec detailed decorating

High spec detailed work decorating

High spec detailed decorating

IMAG0488 IMAG0489 IMAG0490 IMAG0491 IMAG0492 IMAG0493 IMAG0494 IMAG0495 IMAG0496 IMAG0497 IMAG0498 IMAG0500 IMAG0504 IMAG0506 IMAG0508

DSC_0098 DSC_0045 DSC_0043 DSC_0132 Green House wpid-dsc_0028.jpg DSC_0079 DSC_0029 DSC_0028 DSC_0112

Seated shoe box

Seated shoe box

sill replaced on window

Sill replaced on window which was cut down to size an shape from a 3×4 treated timber.

Plastering wall


Recent Posts

Laminate Flooring and skirting replaced.

The old laminate and skirting is removed to make way for the new.


Having prepared the area the job to get the new skirting starts, and when that is good the skirting is fitted, which nicely covers the gap left between the laminate boards and the wall.


Nice job, the customer is very pleased.

  1. Laminate flooring & skirting Leave a reply
  2. Door frame widened and hung door. Leave a reply
  3. Chimney breast covered over Leave a reply
  4. Window blocked up. Leave a reply
  5. New toilet fitted Leave a reply
  6. One of those butterfly bushes. Leave a reply
  7. Bathroom basin fitted Leave a reply
  8. New back door replaced. Leave a reply
  9. Base cabinet fitted in kitchen. Leave a reply
  10. Tiling job. Leave a reply
  11. New window replaced in garage. Leave a reply
  12. Waste pipe dug & assembled for toilet waste to connect to mains. Leave a reply
  13. Entrance made through from Kitchen to garage Leave a reply
  14. Plastering ceiling Leave a reply
  15. Lintel replaced over garage door Leave a reply
  16. Double door entrance to sitting room turned into on door entrance. Leave a reply