The old Wall paper has to be removed along with the wall paper past and the wall sponged down to give a clean surface before plaster is applied. Multi Finished is use but before a bonding coat of PVA is painted to the area.

The old Wall paper has to be removed along with the wall paper past and the wall sponged down to give a clean surface before plaster is applied. Multi Finished is use but before a bonding coat of PVA is painted to the area.
The drive had a soil/clay base and was subsiding through use. The solution was to dig a 650mm deep
by 350mm wide trench the length of the drive and fill with foundation concrete. This would stop further subsidence and give support to the paving slabs. Job completed in 3.5 days.
Fitted new post into concrete and bolted new post to garage wall. Added 3 rails for extra strength. I nice job by Chris at Ashtons Handyman Services.