Categories
Ashtons Handyman Servies

Drive way new foundation applied.

The drive had a soil/clay base and was subsiding through use. The solution was to dig a 650mm deep

by 350mm wide trench the length of the drive and fill with foundation concrete. This would stop further subsidence and give support to the paving slabs. Job completed in 3.5 days.