Drive way new foundation applied.

The drive had a soil/clay base and was subsiding through use. The solution was to dig a 650mm deep

by 350mm wide trench the length of the drive and fill with foundation concrete. This would stop further subsidence and give support to the paving slabs. Job completed in 3.5 days.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s