As you can see the leak had affected the laminate flooring, so time to replace. The customer wanted floor tiles and for the pipes to be boxed in under the towel rail.

Once l had the tiles stuck down, l was ready to grout.
I boxed in the pipes read to tile over.
Nice job. Completed in a day and half. Floor tiling by Chris.