Categories
Ashtons Handyman Servies

Front of shed paneling needs replacing

The customer wants the rotten timbers replacing with new boards to the front of his shed.

img_20190924_102553img_20190924_102602

So let’s get to it, take some measurements and get the timber from JT Atkinson builders merchants. Having removed the old boards from the front I can see that the timber frame is also rotten along the base and up the 3×2 stud work. I will have to cut the old and replace with new.

img_20191002_121645
The 3×2 frame is rotten along the base and up the vertical studs.

img_20191002_123409

img_20191002_121639

There now it’s time to fit the boards to match in with the existing Shiplap.

img_20191002_154307

Job done, including using up the leftover shiplap board and replacing it on the door to match in.

Now to get the rotten timber to the skip. All in a day’s work.