Categories
Uncategorized

Flat Pack assembly of Wardrobe.

Flat pack assembly by Astons Handyman. Advice is to take your time and work methodically.

This slideshow requires JavaScript.

Categories
Uncategorized

Boxed in heating pipes in Middlesbrough

Boxing in Heating pipes

Categories
Uncategorized

Greenhouse Assemley

This greenhouse, which I must mention was of a good quality, was assembled at Thornaby allotments. Took a day and a half as all the side glazing had to be sealed with a rubber hosing. Bolted the base down to stop it from blowing away. Very sturdy.

Greenhouse assembly_1 2014-10-06 15.41.29

Categories
Uncategorized

Taking down a wall and lintel.

James gives a hand at removing a partition and lintel. Then we make good the scars left on the walls and ceiling with plaster. What a difference this makes to the room. Job done in 2 days.

2014-07-22 11.27.40 2014-07-22 14.17.35 2014-07-22 14.17.44 2014-07-23 17.44.20 2014-07-23 17.44.47 2014-07-23 17.44.59

Categories
Uncategorized

Flat pack assembly of a wardlobe

IMAG0500 IMAG0508 IMAG0498 IMAG0497 IMAG0496 IMAG0495 IMAG0494 IMAG0493 IMAG0492 IMAG0491 IMAG0490 IMAG0489 Flat pack assembly

Categories
Uncategorized

Plastering skimming a ceiling

DSC_0029

Categories
Uncategorized

Making a new shed door and replacing the old

The old shed door to replaceMaking a new shed door and replacing the old

Painted and fitted

Categories
Uncategorized

Repointing a chimney at Doug’s bungalow

Repointing a chimney at Doug's bungalow

Me on the roof

Categories
Uncategorized

Small plastering job competed

This area was water damaged. The loose plaster was chipped back to firm and the board was screwed to the joists where it had pulled away. Plaster applied and finished off. 2 hours work for £50.

image

image

image

Call Chris in 07947125983 for a quote. Any job will do.

Categories
Uncategorized

Seated Shoe Box made fitted under the window

 

 

 

At last! A place to store all those kiddies shoes that get left around the kitchen floor. Made this seated boxed unit out of 19 mm tongue and groove pine floor boarding with a 2×2 frame fixed to the wall under the window makes a nice seat to. Will probable paint a white wash or sealant over to stop marks.IMAG0648 IMAG0647 IMAG0646 IMAG0645 IMAG0644 IMAG0643

Categories
Uncategorized

Window sill is replace.

The old sill and rotten wood is removed from the frame and I packet in the parts of the frame that had go rotten with new timber. I then cut down to size a treated 3×4 inch timber, giving a slop away from the window and cutting a grove on the under side for water dispersal. I then use wooden trim around the glass and sealed with frame sealant. The sill was screwed on from inside the window using 120 mm screw.

Rottern wood is removed and the old sill.
Rotten wood is removed and the old sill.
sill replaced on window
Sill replaced on window which was cut down to size an shape from a 3×4 treated timber.

Just needs frame sealant applied & top coat of gloss exterior paint. Look great and the customer didn’t need to purchase a new window. Job done at the fraction of the price!

Categories
Uncategorized

Decking job completed for Gavin in Eaglescliffe. Nice job thanks James for your help.

Categories
Uncategorized

Ashtons Handyman Property Services

Ashtons Handyman Property Services

Categories
Uncategorized

Concrete in and leveled. That should stop any movement. Now to lay the sharp sand to place the paving slabs

Categories
Uncategorized

Concrete mixer arrives.

http://ashtonshandyman.tumblr.com

Categories
Uncategorized

Concrete goes into footing trench dug out by hand! Nice job, hard work. But l like it.

Categories
Uncategorized

Front shop painted in Stockton on Tees

image

Tower was used to get up over window. 2 coats applied. No rain!